Back on track and getting
ready to cast the plinth. Put the M6 threaded inserts in place for
securing the tonearm. I used the threaded connectors that are for
joining lengths of threaded bar or studding. Dropped in a couple of
Aluminium tubes as tunnels for the cabling. I made use of all the
redundant screw bosses, I used a large washer and screw to create lots
of Mushroom head anchor points for the casting to latch on to.
|
 |